🎁 Book Free Call to Scale

Roadmap

From your Current Reality (Now) to your Desired Reality (Vision)

3 free steps to find where your company waits for you. Then we build the systems, with your team. LeapCodeβ„’ is your guide. You are the hero.

  • 3free first steps
  • 6execution steps
  • 13weeks per installation
  • 3Stage Gates: Day 21, 40 and 90

πŸ—Ί The whole road, step by step

The steps in each group are joined by moving dots, and the groups are joined by 1 flowing line. You always see where you are, and what comes next.

Current Reality (Now) (Point A)

Before anything is built, we find out what is true. These 3 steps each go a little deeper, and the first 2 you can do yourself.

  1. Start Here

    🏎️ Quick Momentum Checkβ„’

    7 questions, about 2 minutes, free, no login. It names your leakage point: leads, price or follow-up.

    • What: 7 questions on your leads, price and follow-up
    • Time: about 2 minutes, no login
    • You get: your leakage point, named in plain words
    • Cost: free
    🏎️ Check Now #1
  2. πŸ”¬ Root-Cause Checkβ„’

    Inside LeapCode OSβ„’, free. About 26 questions on your leakage point, built from your earlier answers.

    A deeper check, area by area, with a result in plain words for each answer.

    • What: a deeper check inside LeapCode OS, area by area
    • About 26 questions, built from your earlier answers
    • You get: a result in plain words for each answer
    • Cost: free
    #2
  3. πŸ“ž Call to Scale

    A free 30-minute call. We read your result together and name your 1st fix, and we tell you plainly if we are not the right fit.

    • What: a 30-minute call with a real person
    • We read your result together and name your 1st fix
    • We tell you plainly if we are not the right fit
    • Cost: free
    🎁 Book Free Call to Scale #3

Desired Reality (Vision) (Point B)

Where your company runs on systems and you are in it by choice, not by need. We check the evidence 1st, then we build.

  1. Paid

    πŸ”Ž Pre-Scale Auditβ„’

    LeapCodeβ„’ checks the evidence: your numbers, documents and how work really runs, before any build is planned. We look across 4 pillars (CEO, Offer, Client, Base).

    • What: LeapCodeβ„’ checks the evidence before any build is planned
    • We look at your numbers, documents and how work really runs
    • 4 pillars: CEO, Offer, Client and Base
    • Cost: the 1st paid step on the road
    #1
  2. 🧩 Pick the right system

    Together we choose the unit and the engine that fit your gap, from 6 units and their 14 engines. You get 1 clear starting point instead of a long list.

    See the units and engines

    • What: we choose the unit and the engine that fit your gap
    • From 6 units and their 14 engines
    • You get 1 clear starting point, not a long list
    #2
  3. ✍️ Sign-up and contract

    Clear terms, signed together. The price, the stages and what is included are written down before work starts.

    If a gate is not met and the cause is on our side, that stage is not billed further.

    • What: clear terms, signed together
    • Price, stages and what is included are written down before work starts
    • If a gate is not met and the cause is on our side, that stage is not billed further
    #3
  4. πŸ”­ Vision workshop

    Visionfulnessβ„’, Level 1: 4.5 hours that turn your audit into a direction. The Direction Scorecard Engine then builds the strategy map and the scorecard lines each person will own.

    You get a written vision and a 1-page vision map. It is a direction, never a number in your contract.

    • What: 4.5 hours that turn your audit into a direction
    • The strategy map and the scorecard lines each person will own
    • You get a written vision and a 1-page vision map
    • It is a direction, never a number in your contract
    #4

Let’s LEAP (Build Β· Install Β· Scale)

The same 6 steps you will see on every offer page, installed over 13 weeks. Stages: Setup (Pre-Alpha) Β· 3. Pilot Β· 2. Standardize Β· 1. Optimize. Each stage ends in a written gate you accept, with Stage Gates on Day 21, 40 and 90.

  1. 🏁 Do

    We start moving. Small, visible wins come first.

    • Step 1 of 6 in the 13-week installation
    • We start moving
    • Small, visible wins come first
    #1
  2. ✏️ Design

    Your systems are drawn on paper before anything is built.

    • Step 2 of 6 in the 13-week installation
    • Your systems are drawn on paper first
    • Nothing is built before the plan is clear
    #2
  3. πŸ”§ First Fix

    We repair the biggest bottleneck so you feel relief early.

    • Step 3 of 6 in the 13-week installation
    • We repair your biggest bottleneck
    • Built so you most likely feel relief early
    #3
  4. 🧱 Setup (Pre-Alpha)

    We build the 1st working version of your system.

    • Step 4 of 6 in the 13-week installation
    • We build the 1st working version of your system
    • Stage: Setup (Pre-Alpha), Build
    • Ends in a written gate you accept
    #4
  5. πŸ§ͺ 3. Pilot

    Your team tries it, with us beside them.

    • Step 5 of 6 in the 13-week installation
    • Your team tries it, with us beside them
    • Stage: 3. Pilot, Handheld Run
    • Ends in a written gate you accept
    #5
  6. 🚦 Day 90 gate

    Your team runs it while we watch. If the gate is not met and the cause is on our side, that step is not billed further.

    • Step 6 of 6 in the 13-week installation
    • Your team runs it while we watch
    • Stage Gate on Day 90
    • If the gate is not met and the cause is on our side, that step is not billed further
    #6

The 6 steps install 1 engine. The business then climbs 5 stages: Setup, Pilot, Standardize, Optimize and UpLeap (Scale), which UpLeap OSβ„’ carries. See how the steps and stages fit together on the Systems Leapβ„’ page.

UpLeap (Scale) (Eyes on the dashboard)

  1. πŸ“ˆ Eyes on the dashboard

    Your team runs the engines; you steer from the weekly scorecard. Carried by UpLeap OSβ„’, Done-With-You (DWY).

    • What: your team runs the engines; you steer from the weekly scorecard
    • Carried by UpLeap OSβ„’
    • Done-With-You (DWY) only from here
    • Built so you can step back, most likely with far less stress
    #1
  2. πŸ“Š Pre-Scale Auditβ„’, run again at week 13

    At week 13 we score again, with the same checks you started with, so you can see how far the business moved.

    • What: at week 13 we score again
    • The same checks you started with
    • You see how far the business moved
    #2

It is built so you can step back, most likely with far less stress, if the process is followed properly, with good intention and best effort. We guarantee the system, never the revenue.

πŸ›  How we work

  • Audit before advice.We look across 4 pillars, using your own numbers.
  • You are the hero, we are the guide.You decide where the company goes; we show the road and say what we see.
  • Gates, not calendars.Each stage ends with a written test, with a number and a date on it.
  • 6 steps over 13 weekswith Stage Gates on Day 21, Day 40 and Day 90.
  • Our miss? That stage is not billed.The risk-free stage guarantee, in writing.
  • We hand it over.You keep the systems, the training and the reasoning behind them.

If you stepped away for 2 weeks, would your company still know where it is heading? That is the question every audit starts from.

Your road starts with 1 free call.

30 minutes, with your numbers open. You leave with quick fixes you can start adapting straight away.

🎁 Book Free Call to Scale